Back to project list

  • Construction of new staff accommodation block in traditional loadbearing masonry construction incorporating pre-cast concrete bathroom pods.
  • Drainage study of existing foul drainage network discharging via existing rising main.
  • Specification of upgrade of pumping and storage equipment to facilitate new 100 bedroom extension, new gymnasium and conference room extension.
  • Gymnasium, leisure and conference room extensions in steel frame structure with in-situ reinforced concrete upper floors.
  • New 36 bed Bedroom block and 6 meeting rooms in traditional loadbearing masonry construction.
  • Extensive alterations to existing hotel structure to facilitate complete refit and upgrade of existing front of house areas and restaurant/bistro facilities.
  • Client website: www.marstonhotels.co.uk