Back to project list

  • Refurbishment and alteration of existing office building constructed in the 1970s in London WC2.
  • Original floor slabs constructed in ribbed concrete construction using wood wool permanent shuttering causing serious structural defects to in-situ floor slabs.
  • Drawing, Detailing, Specification and Supervision of removal of wood wool slabs and structural repairs to floors.
  • Specifying load testing of strengthened floors and interpreting results.
  • Surveying external steel stairs identifying defects and scheduling and specifying remedial repairs.
  • Minor alterations to structural layout in core areas.