Back to project list

  • Demolition of existing 3 story pre-cast concrete portal frame industrial building and adjacent reinforced concrete factory building, immediately adjacent to railway line.
  • Design of dead shore and anti sway bracing to stabilise pre-cast frame at all stages of dismantling and demolition.
  • Production of drawings, details, calculations, specifications for approval by Network Rail for all stages of demolition.
  • Detailed method statements and sequencing for erection of temporary works, dismantling and demolition works.
  • Design of protection scaffold on railway boundary in accordance with Network Rail specifications for both erection and dismantling.
  • Regular monitoring of the works, joint visits with Network Rail
  • Client website: www.frendcastle.co.uk